Call free on: 0808 303 1101
Our Services
From standard container solutions to expert conversions, modifications, repairs and modular buildings – S Jones covers it all. We also provide industry-leading services for self-storage operators. Explore what’s possible by choosing a service on the left.
Shipping Containers for Sale
From small to large-scale storage, find the ideal shipping container to suit your needs at a competitive price.
Shipping Containers for Hire
Discover our huge range of storage containers for hire, plus welfare and workspace units that provide quick and easy site solutions.
Specialist Container Conversions
We’re a trusted provider of standard and bespoke container conversions, designed for industrial, commercial, and specialist applications.
Modular Buildings
Engineered for fast installation and long-term performance, our modular buildings provide flexible space solutions for every sector.
Shipping Container Modifications
From insulation to electrics and security upgrades, we provide tailored container modifications that transform standard units into practical, high-performance spaces.
Shipping Container Repairs
On-site container repairs and restoration that reduce downtime and save you money.
Standard Container Conversions
Discover our range of ready-made offices, chemical stores and topper containers - professionally converted, and available for rapid turnaround.
StoragePro
Container sales paired with expert support give you everything you need to start or grow a successful self storage site. Explore our Core, Plus and Ultimate packages and scale with confidence.
Shipping Container Finance
Take advantage of flexible finance options for bulk orders through Approved Business Finance. Your streamlined, stress-free purchase is only a click away.
We’ve designed and delivered a bespoke battery charging solution for Traffic Group Signals to provide a safe space to charge its lead acid batteries at its new site, with safety being the main priority.
Part of The Traffic Group, a collective of specialist technology innovators focused on improving traffic and travel systems, Traffic Group Signals is a manufacturer of temporary and permanent traffic management solutions used across the UK. The business designs and supplies traffic signal equipment for roadworks, infrastructure projects, and local authority networks, where reliability and safety are critical.
Operating within a highly regulated environment, Traffic Group Signals requires robust, compliant facilities to support the manufacture, testing, and maintenance of its battery-powered systems.
Traffic Group Signals wanted to incorporate a lead acid battery charging facility within its new building to house the VRLA (Valve-Regulated Lead-Acid) batteries which power its traffic light units. However, due to the potential risk of fire and explosion of hydrogen gas during the charging process it wasn’t possible to secure appropriate buildings insurance. The team needed a specialist containerised storage and charging solution which could be located well away from the main building and would contain any fire and provide adequate access for emergency services.
Using an ISO 20ft high cube side opening shipping container as the basis, we converted the unit at our dedicated workshop. As part of the project, we installed a fire alarm system with relay links to a contactor safety circuit to turn power to the battery compartment off in the event of an alarm or depression of a manual e-stop and our patented Contain-A-Lock® provides extra security.
We divided the container into two compartments, separated by a fire rated ‘L’ shaped bulkhead gas sealed at atmospheric pressure. These compartments provide a small area to house standard charging equipment plus a larger separate compartment with bespoke racking designed to hold up to 48 12v VRLA batteries. The racking also included dummy DC charging connectors to secure the charging cables and keep them clear of each shelf location while being loaded into the unit by forklift truck.
All works were completed within the guidelines outlined by BS EN IEC 62485-2: 2018 Safety Requirements for Secondary Batteries and Battery Installation. Using projected hydrogen emission calculations, the team created a ventilation system using an ATEX Zone 1 lighting and ATEX Zone 1 fan forced air solution. An additional safety factor fan was also incorporated into the ventilation design to ensure that concentrations of hydrogen in air within the container battery compartment would never reach their explosion limit even if one of the two installed ATEX fans failed. Power to the ATEX fan ventilation circuits is designed to switch on automatically and run continually when any one of the 48 battery chargers is switched on.
“The design and construction of a bespoke battery charging facility was new ground for Traffic Group Signals. S Jones provided us with advice on the design and technical aspects of our proposed unit, having listened to our original requirements. They guided us through the options available to us, to arrive at a design that not only fulfilled our needs but complied to all the relevant safety standards. They involved us throughout the process and completed the unit to the agreed schedule.” – Mark Hutchinson, Director at The Traffic Group.
We design and deliver bespoke containerised battery charging and storage solutions engineered to manage fire, gas, and electrical risks. Built to meet relevant safety standards and located away from occupied buildings, our container conversions provide secure, controlled environments for critical battery operations.
Learn more about our container conversion capabilities or contact us today to discuss your project.